iDrive 150 Small PCB - Testing OPEN - CLOSE Manual Switch
If your iDrive 150 Manual switch may be giving your some issues and here is a process in testing the switches functionality.
with your testing you will have to have your meter leads ant the 2 soldering point locations to determine continuity or DC Voltage.
When testing you would have to test for Voltage when the switch is:
ON (for 24v) as well as the OFF (for residual voltage)
OFF (for 24v) as well as the OFF (for residual voltage)
Related Articles
iDrive 300 Standard PCB - Testing OPEN - CLOSE Manual Switch
If your iDrive 300 Manual switch may be giving your some issues and here is a process in testing the switches functionality. Please view the following video link to show you the process of testing the switch. iDrive 300 Testing OPEN - CLOSE Manual ...
iDrive Troubleshooting
iDrive (* 1 iDrive per motor*) The iGROW is just dry switching contacts that the iDrive receives. Master into a Slave On the J2 PCB #3  (to 24VAC transformer) remove and INDEPENDENTLY cap off. Slave - Make into a Slave J1 on circut board (9 - 10 ...
iDrive Troubleshooting guide
Please view the information provided and attached to assist you in resolving your iDrive Issues. Please contact us with your findings at (714) 975-9474 or email us at support@link4Corp.com
iDrive 300 Standard PCB - Testing AUTO Control Terminal Points
view the following process in testing your iDrive PCB to see if the Automated function is working properly. when controlling your AC Motor, its good to test the AUTO function to ensure the motor controller is working properly.
Wiring an iDrive to a Single Phase 3 Wire Ridder Electric Motor Will Open But Not Close
It has been brought to our attention that some of these motors may have undergone a revision which makes the drawing for the Ridder motor that the iDrive ships with incorrect. Our drawing will allow you to connect the motor and open it with an iDrive ...