1000 Series Communication and Sensor Mapping

1000 Series Communication and Sensor Mapping

You have to make sure that your communications on your Controller network is set correctly.

For your network  (1 1600 & 2 1400) you have to determine how its going to be mapped:
1 site master 2 slaves
1 site master 1 Zone Master 1 Slave
1 Site master, 2 Zone Masters and so forth.
    • Related Articles

    • 1000 Series Communication Issues

      If the SM can’t see Zone Master, it could be a: · Wiring · Programming · Chip Issue On the Comm Diag Screen on the Site Master, are Zone 2 & 3 Displaying 3’s on the 1st column, 3 represents successful communication within the network. Please get the ...
    • 1000 Series - Rain Sensor Troubleshooting

      Please view the following information to assist in troubleshooting your RAIN SENSOR. 1st try a soft Reset to see if your rain sensor will react to RAIN If the soft reset does not work Check the Sensor Mapping Test The FDIn2 Port on the Controller and ...
    • System Setup - Set Up Inputs

      Setup Inputs is where the user defines which sensors the Pearl™ will use, a process also known as sensor mapping. The screen above shows the typical sensor mapping for each sensor. If there is no particular sensor used, then leave the setting as None ...
    • iPonic 600 Series - Communication Module Install #1

      THIS PRODUCT HAS BEEN DISCONTINUED AND REPLACED BY THE PEARL CONTROL SYSTEM. https://link4controls.com/link4_controllers/ Click below for part 1 of the communication module installation series.
    • 1000 Series Rain Sensor Stand Alone Wiring and Installation

      Here is information for wiring up your Rain Sensor to the iGrow1000 Series Controller View the following link before installing, attached is information as well. Rain Sensor Dip Switch Setting Information